KisanKendra is not a government website or an official scheme, mandi or trading portal. Information is for awareness only.

Model farm project · On the farm

Solar pump for irrigation

A pump run by solar panels in the field, replacing a diesel engine or an unreliable electric connection for daytime irrigation.

Who this suits

Farmers with their own well, borewell, pond or canal lift who irrigate with diesel, or who have no grid connection or get power only at night.

What the project is

A solar pump has almost no running cost: no diesel, no electricity bill, and irrigation in daylight hours. Its output follows the sun, strongest around midday and lower on cloudy days, so it suits crops that can be irrigated by day and farms that pair it with drip, sprinklers or a storage tank.

The pump must be matched to the water source: the depth to water, the yield of the well and the area to be irrigated. An oversized pump on a weak borewell runs dry; an undersized one cannot lift from the depth. A site survey decides the size, not the neighbour's choice.

Sizes and indicative investment

SizeWhat it includesIndicative investment
3 HPOpen well or shallow borewell, about 2 to 3 acres₹1.6 lakh to ₹2.4 lakh
5 HPMedium-depth borewell, about 4 to 5 acres₹2.4 lakh to ₹3.5 lakh
7.5 HPDeeper borewell or larger area₹3.6 lakh to ₹5 lakh

These ranges are a starting point only, written in November 2026. They leave out the price of land. Take at least two written quotations before you fix your own figure.

What you need

  • A water source of your own with a known depth and yield
  • A shadow-free spot for the panels close to the source
  • A survey by the empanelled supplier to fix pump type and size
  • Fencing or another safeguard against theft and stray animals
  • A way to use midday water well: drip, sprinklers or a storage tank

Where the money goes

  • Solar panels, mounting structure, pump and controller (supplied as one set)
  • Your share of the cost after the subsidy, paid to the agency named by the scheme
  • Foundation, pipes and fencing
  • Occasional cleaning and repairs after the warranty period
  • Insurance, where it is not already included

Where the income comes from

  • Savings on diesel or electricity every season
  • A second or third crop where water was limited by fuel cost or power supply
  • In some state programmes, payment for surplus power from grid-connected pumps

Licences, registrations and papers

  • No licence is needed
  • Land record, identity and bank details for the application
  • Application only on your state's official portal or at the nodal agency's office
  • Any groundwater permission your state requires for a new borewell

How the bank loan works

  • The bank asks for a project report: what you will build or buy, quotations, expected income and costs, and how the loan will be repaid.
  • You put in part of the cost yourself (the margin). The share differs by bank, scheme and the size of the loan.
  • Repayment usually starts after a short holiday period, so that the project can begin earning first.
  • Where a scheme gives a subsidy, it is normally sanctioned before you buy and released after inspection, often into the loan account. Do not count on it for your own share.
  • Nobody can promise that a loan or subsidy will be approved. Be careful of anyone who asks for money to get it sanctioned.

What usually goes wrong

  • Fake websites and agents collecting 'registration fees' for solar pumps: pay only to the government agency named in your sanction letter
  • Falling groundwater leaving the pump unable to reach the water
  • Theft or breakage of panels in unguarded fields
  • Expecting full output on cloudy and winter days

Steps to take, in order

  1. Note your well's depth, water level in summer and the area to irrigate
  2. Check on the state nodal agency's official portal whether applications are open
  3. Apply yourself or through the agriculture office; do not pay any agent
  4. Let the empanelled supplier survey the site and confirm the pump size
  5. Pay only your approved share, by the method the sanction letter states
  6. At installation, check the discharge, take the warranty papers and learn basic care

In your state

Central schemes are run through state departments, and many states add support of their own. The amounts differ by state and change every year, so we do not list them: the department named below will tell you what is open now. We name each state's portal but do not link to it, because look-alike websites exist. Reach it from your state government's official website.

Bihar
  • Solar pumps: ask the district office of the state's renewable energy agency, or the agriculture office how to apply in Bihar.
  • Agriculture Department: applications are taken through the DBT Agriculture portal (a farmer registration number is needed first). For help, ask the District Agriculture Officer or the block agriculture office.
  • A Bihar scheme on this site: Krishi Input Anudan Yojana (Agriculture Input Subsidy)
Gujarat
  • Solar pumps: ask the district office of the state's renewable energy agency, or the agriculture office how to apply in Gujarat.
  • Agriculture Department: applications are taken through the i-Khedut portal. For help, ask the District Agriculture Officer or the block agriculture office.
  • A Gujarat scheme on this site: Mukhyamantri Pak Sangrah Structure Yojana (Crop Storage Structure Scheme)
Haryana
  • Solar pumps: applications are taken through the New and Renewable Energy Department (HAREDA). For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through the Agriculture Department's portal, after registering on Meri Fasal Mera Byora. For help, ask the District Agriculture Officer or the block agriculture office.
  • A Haryana scheme on this site: Mera Pani Meri Virasat
Karnataka
  • Solar pumps: applications are taken through Karnataka Renewable Energy Development Limited (KREDL). For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through K-Kisan, using your FRUITS farmer ID. For help, ask the District Agriculture Officer or the block agriculture office.
Madhya Pradesh
  • Solar pumps: applications are taken through Madhya Pradesh Urja Vikas Nigam. For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through the e-Krishi Yantra Anudan portal (machines and irrigation equipment). For help, ask the District Agriculture Officer or the block agriculture office.
  • A Madhya Pradesh scheme on this site: Mukhyamantri Kisan Kalyan Yojana
Maharashtra
  • Solar pumps: applications are taken through MEDA and the state electricity distribution company (MSEDCL). For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through the MahaDBT Farmer portal. For help, ask the District Agriculture Officer or the block agriculture office.
  • A Maharashtra scheme on this site: Namo Shetkari Mahasanman Nidhi Yojana
Odisha
  • Solar pumps: applications are taken through Odisha Renewable Energy Development Agency (OREDA). For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through the Go-Sugam portal. For help, ask the District Agriculture Officer or the block agriculture office.
  • A Odisha scheme on this site: CM-KISAN, Odisha
Punjab
  • Solar pumps: applications are taken through Punjab Energy Development Agency (PEDA). For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through the Agri Machinery Punjab portal (for machines). For help, ask the District Agriculture Officer or the block agriculture office.
  • A Punjab scheme on this site: Financial Assistance for Direct Seeded Rice (DSR)
Rajasthan
  • Solar pumps: applications are taken through the Horticulture Department, through the Raj Kisan Saathi portal. For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through the Raj Kisan Saathi portal. For help, ask the District Agriculture Officer or the block agriculture office.
Tamil Nadu
  • Solar pumps: applications are taken through the Agricultural Engineering Department. For help, ask the district office of the state's renewable energy agency, or the agriculture office.
  • Agriculture Department: applications are taken through the Agriculture Department's portal and the Uzhavan app. For help, ask the District Agriculture Officer or the block agriculture office.
Uttar Pradesh
  • Solar pumps: ask the district office of the state's renewable energy agency, or the agriculture office how to apply in Uttar Pradesh.
  • Agriculture Department: applications are taken through the Agriculture Department's portal (farmer registration needed first). For help, ask the District Agriculture Officer or the block agriculture office.

In any other state, ask the same department at your district headquarters.

Common questions

How much does a farmer pay for a solar pump under the government scheme?

The scheme shares the cost between the central government, the state and the farmer, and part of the farmer's share can be a bank loan. The split differs by state and category and changes over time. See our scheme page and your state portal for the current share; the full-cost figures on this page are before any subsidy.

What size of solar pump do I need?

It depends on the total head (how far the water must be lifted and pushed) and the water you need each day. As a rough guide, shallow sources and a few acres suit smaller pumps and deep borewells need larger ones, but only a site survey can fix it.

Does a solar pump work on cloudy days or at night?

It works at reduced output under cloud and not at night, unless it is a grid-connected or hybrid set. Plan irrigation for daylight and, where possible, store water in a tank or pond for use at other times.

Can I replace my diesel pump with a solar one?

Often yes, and that is one of the scheme's aims. The solar pump is chosen to match your well and the output you were getting. Some farmers keep the diesel engine as a standby for the first year.

How do I know a solar pump website is genuine?

Use only the portal of the central ministry or of your state's nodal agency, reached from the government's own site, or apply at the agriculture office. The ministry has repeatedly warned about look-alike websites and messages asking for registration money. KisanKendra does not take applications or payments for any scheme.

How long do the panels and pump last?

Panels usually carry a long performance warranty and the pump set a shorter one. Keeping panels clean and the controller dry is most of the care needed. Keep the warranty card and the supplier's service number.

What might the loan instalment be?

Pick a size or type your own cost, then change the share, rate and years to match what your bank tells you.

Start from a size

Your own money
₹50,000
Bank loan
₹1,50,000
Instalment each month
₹2,490
Interest paid over the whole period
₹59,175

An estimate with equal monthly instalments. The starting figures are examples, not an offer from any bank: your bank fixes the rate, your share, the repayment holiday and whether you pay monthly, quarterly or by season. Any subsidy is left out, because it comes only after sanction. Nothing you type is saved or sent to us.

Get this project prepared for your land or group

The brief above is free. If you want it worked out for your own situation, our sister service Impactory Hub prepares a report made for you:

  • Costs worked out for your land, your scale and current quotations in your district
  • Month-by-month income and expense estimates and a loan repayment schedule
  • The schemes you can apply for in your state, with the documents needed
  • A report in the format banks ask for

This is a paid service of Impactory Hub: ₹24,999 to ₹74,999, depending on the size of the project. They call you first, free of charge, and confirm the fee in a written quote before any work starts. No payment is taken on KisanKendra, and a report does not guarantee a loan or subsidy.

Do not write a survey number, Aadhaar number or bank detail.

Do not write an Aadhaar number, PAN, bank details, OTP or password here.